Home

News

Building Envelope Consulting Services for 210 N. Carpenter, Chicago

The scope of this building envelope peer review of Chicago’s 210 N Carpenter  project is focused on the building envelope materials, details and specifications. This review for  the vertical surfaces does not delve into the roof or terrace systems (horizontal).

The review documents provided for review are the Permit / GMP documents and specifications.

In addition to the envelope review, Integral Consulting was asked to provide feedback on the level 2 parking deck waterproofing systems and to develop a strategy (future) for system recommendations for an appropriate water control system.

Lastly, Integral Consulting LLC was asked to provide a list of design concerns related to humidity, vapor and odor containment for the pool enclosure to be used as an agenda for a meeting (future) with the architect and mechanical engineer.

INTEGRAL NEWS